BecSpec Because specs matter.
United States · AIM Act Technology Transitions · 40 CFR Part 84

Which US HFC rule applies to this system and date?

Check the federal AIM Act rule for a refrigeration, air-conditioning, heat-pump or chiller job. BecSpec works from the system type, date, refrigerant and the facts that can change the rule. A legal GWP result is not a recommendation to put that refrigerant in the equipment.

Scope: this checker covers selected federal 40 CFR §84.54 installation rules, including cases where work on existing equipment counts as a new installation. It does not check SNAP, Section 608, product manufacture/import/sale or state/local rules.

1. Activity and system

2. System facts

Only enter facts that can change the federal result. Leave anything you genuinely do not know blank; BecSpec will show what still needs checking.

3. Existing-system work

Some work on an existing system is legally treated as a new installation under the Technology Transitions rules. These questions are about that legal classification, not how to carry out the work.

3. Residential / light-commercial transition evidence

3. VRF transition evidence

3. Industrial-process refrigeration evidence

4. Project transition evidence

US HFC phase-down dates are system-specific

The AIM Act Technology Transitions rules do not create one universal refrigerant-ban date. Residential/light-commercial air conditioning, VRF, chillers, data-center cooling, cold storage, supermarkets, remote condensing units and industrial-process refrigeration use different dates, thresholds and transition provisions.

Existing system repair is not automatically exempt

Ordinary repair may sit outside the new-installation restrictions, but §84.54(e) lists circumstances where work on existing equipment counts as an installation. The checker asks those questions rather than assuming every repair is exempt.

Federal eligibility is not refrigerant compatibility

Passing an assessed GWP limit does not mean a refrigerant is compatible with the equipment, permitted by EPA SNAP, approved by the manufacturer, or acceptable under fire, building, mechanical, state or local rules.

Rule version

Based on current 40 CFR Part 84 Subpart B and EPA Technology Transitions material. Where a transition route depends on evidence, the result tells you what you need to prove.